All PREPRUFE® Detail Drawings

PREPRUFE® / PREPRUFE® Plus DWG File PDF File
PRE-009-A — Blind Side Wall to Slab Tie-in (Option A) PRE-009-A (DWG) PRE-009-A (PDF)
PRE-009-B — Blind Side Wall to Slab Tie-in (Option B) PRE-009-B (DWG) PRE-009-B (PDF)
PRE-010 — Below Slab Drainage with HYDRODUCT® Connector Tee PRE-010 (DWG) PRE-010 (PDF)
PRE-031 — End Lap Detail for Wall or Slab (Option 1) PRE-031 (DWG) PRE-031 (PDF)
PRE-032 — End Lap Detail for Wall or Slab (Option 2) PRE-032 (DWG) PRE-032 (PDF)
PRE-033 — Inside Corner - Custom Formed PRE-033 (DWG) PRE-033 (PDF)
PRE-034 — Pipe Penetration for Wall or Slab PRE-034 (DWG) PRE-034 (PDF)
PRE-035 — Straight Edge Penetration PRE-035 (DWG) PRE-035 (PDF)
PRE-036 — Outside Corner - Custom Formed PRE-036 (PDF) PRE-036 (DWG)
PRE-037 — Column (Option1) PRE-037 (DWG) PRE-037 (PDF)
PRE-038 — Column (Option2) PRE-038 (DWG) PRE-038 (PDF)
PRE-039 — Wall Termination for Elevated Slabs PRE-039 (DWG) PRE-039 (PDF)
PRE-040 — Wall Termination to Bituthene® Membrane PRE-040 (DWG) PRE-040 (PDF)
PRE-041 — Wall Termination to Procor® Membrane PRE-041 (DWG) PRE-041 (PDF)
PRE-042-A — Construction Joint (Option A) PRE-042-A (DWG) PRE-042-A (PDF)
PRE-042-B — Construction Joint (Option B) PRE-042-B (DWG) PRE-042-B (PDF)
PRE-043 — Grade Beam Pile Cap (Option 1) PRE-043 (DWG) PRE-043 (PDF)
PRE-044 — Grade Beam Pile Cap (Option 2) PRE-044 (DWG) PRE-044 (PDF)
PRE-045 — Tie into Bituthene® Wall Waterproofing PRE-045 (DWG) PRE-045 (PDF)
PRE-046 — Tieback Cover PRE-046 (DWG) PRE-046 (PDF)
PRE-047 — Soil Retention Tieback Custom Box Cover PRE-047 (DWG) PRE-047 (PDF)
PRE-048 — Top Termination and End Lap PRE-048 (DWG) PRE-048 (PDF)
PRE-049 — Rebar, Dowel and All-thread Penetration PRE-049 (DWG) PRE-049 (PDF)
PRE-054 PRE-054 (DWG)  
PRE-055 PRE-055 (DWG)  
PRE-059 — Side Lap PRE-059 (DWG) PRE-059 (PDF)
PRE-060 — Temporary Protection During Construction Sequencing PRE-060 (DWG) PRE-060 (PDF)
PRE-061 — BITUTHENE® Tie-in with Elevated Slab PRE-061 (DWG) PRE-061 (PDF)

 

PREPRUFE® SCS DWG File PDF File
SCS-001 — Side Lap SCS-001 (DWG) SCS-001 (PDF)
SCS-002 — End Lap SCS-002 (DWG) SCS-002 (PDF)
SCS-003 — Tie-back Cover SCS-003 (DWG) SCS-003 (PDF)
SCS-004 — Penetration SCS-004 (DWG) SCS-004 (PDF)
SCS-005 — Vertical Wall Control/Contraction Joint SCS-005 (DWG) SCS-005 (PDF)
SCS-006 — Tie-in to BITUTHENE® Wall SCS-006 (DWG) SCS-006 (PDF)
SCS-007 — Tie-in to BITUTHENE® Deck SCS-007 (DWG) SCS-007 (PDF)
SCS-008 — Side Termination SCS-008 (DWG) SCS-008 (PDF)
SCS-009 — Base of Wall - Elevation SCS-009 (DWG) SCS-009 (PDF)
SCS-010 — System Cross Section SCS-010 (DWG) SCS-010 (PDF)
SCS-011-A — Base of Wall Tie-in to Slab (Option A) SCS-011-A (DWG) SCS-011-A (PDF)
SCS-011-B — Base of Wall Tie-in to Slab (Option B) SCS-011-B (DWG) SCS-011-B (PDF)
SCS-012 — Vertical to Horizontal Lap SCS-012 (DWG) SCS-012 (PDF)
SCS-013 — Top Termination Detail - Accessible SCS-013 (DWG) SCS-013 (PDF)
SCS-014 — Top Termination Detail - Inaccessible SCS-014 (DWG) SCS-014 (PDF)
SCS-015 — Inside Corner SCS-015 (DWG) SCS-015 (PDF)
SCS-016 — Outside Corner SCS-016 (DWG) SCS-016(PDF)
SCS-017 — Compartmentalization SCS-017 (DWG) SCS-017 (PDF)
SCS-018-A — Base of Wall (Option A) SCS-018-A (DWG) SCS-018-A (PDF)
SCS-018-B — Base of Wall (Option B) SCS-018-B (DWG) SCS-018-B (PDF)
SCS-019-A — Vertical Wall Construction Joint (Option A) SCS-019-A (DWG) SCS-019-A (PDF)
SCS-019-B — Vertical Wall Construction Joint (Option B) SCS-019-B (DWG) SCS-019-B (PDF)
SCS-021 — Custom Tieback Box Cover SCS-021 (DWG) SCS-021 (PDF)
SCS-022 — Wall to Intermediate Slab Tie-in SCS-022 (DWG) SCS-022 (PDF)